Brush clearing of Main Lateral just east of Headgate. Project included brush clearing of ditch right -of-way between Nelson Ct. and the east side of Miller Ct.
Repair of collapsed section of main ditch on the east side of Kipling Street with concrete blocks.
Hydrodig power flushing sediment from main ditch on Miller Street.
Hydrodig flushing sediment from main ditch on Lewis Street.
Forming concrete Main Division Box, replacing old wooden box. Spring 2022.
Forming up replacement Main Division Box.
Old Main Division Box, unknown date of construction.
Map of Lateral 1-2 Division.
Dashed line was old route of Lateral 2 across property on 23 Pl.
The red line is the new route of Lateral 2. Lateral 1 is essentially unchanged, except for major improvement to pipe. The solid black line is 12-inch pipe that now carries both Lateral 1 & 2 east to a new division box.
Construction begins by laying new 10-inch pipe for the new Lateral 2 section, running south to north along the west edge of 2124 Hoyt St.
Special "thanks" to all the volunteers that pitched in to make this improvement project happen:
Fred Clarke, Jeff Bennett, Jeff McKinney, Dean Berggren, Dirk Sutphin, Adam Keinitz, John Schmuck, Dave Devine and Walt Hume.
The old Lateral 1 pipe running east from the old division box had to be replaced with new 12-inch pvc pipe. The damaged section was uncovered during the project and delayed the overall timeline.
The new section of Lateral 2 in place.
Concrete forms for the new Lateral 1-2 Division box.
Recently poured concrete for the old division box to connect two pipes at the junction.