Forming concrete Main Division Box, replacing old wooden box. Spring 2022.
Forming up replacement Main Division Box.
Old Main Division Box, unknown date of construction.
Map of Lateral 1-2 Division.
Dashed line was old route of Lateral 2 across property on 23 Pl.
The red line is the new route of Lateral 2. Lateral 1 is essentially unchanged, except for major improvement to pipe. The solid black line is 12-inch pipe that now carries both Lateral 1 & 2 east to a new division box.
Construction begins by laying new 10-inch pipe for the new Lateral 2 section, running south to north along the west edge of 2124 Hoyt St.
Special "thanks" to all the volunteers that pitched in to make this improvement project happen:
Fred Clarke, Jeff Bennett, Jeff McKinney, Dean Berggren, Dirk Sutphin, Adam Keinitz, John Schmuck, Dave Devine and Walt Hume.
The old Lateral 1 pipe running east from the old division box had to be replaced with new 12-inch pvc pipe. The damaged section was uncovered during the project and delayed the overall timeline.
The new section of Lateral 2 in place.
Concrete forms for the new Lateral 1-2 Division box.
Recently poured concrete for the old division box to connect two pipes at the junction.